Skip to main content

Occupational Employment Statistics


DETAILED OCCUPATION DATA

47-2082 Tapers



Seal joints between plasterboard or other wallboard to prepare wall surface for painting or papering.

Geography Click link for Career Profile EmploymentEmp SE*Percentiles
Mean10th25thMedian75th90th
Minnesota 30060$38.74/hr$30.46/hr$39.16/hr$41.13/hr$41.32/hr$41.56/hr


IndustryOES Employment (Statewide)OES Median Wage (Statewide)
Construction300$41.13/hr
 
Geography Click link for details EmploymentMedian WageProjections
% Change 2022-2032
La Crosse WI-MN MSA N/AN/AN/A
Northeast Minnesota N/AN/AN/A
Northwest Minnesota N/AN/AN/A
Duluth MN-WI MSA N/AN/AN/A
Fargo ND-MN MSA N/AN/AN/A
Rochester MN MSA N/AN/AN/A
Southeast Minnesota N/AN/AN/A
Southwest Minnesota N/AN/AN/A
Grand Forks ND-MN MSA N/AN/AN/A
Mankato-North Mankato MN MSA N/AN/AN/A
St Cloud MN MSA N/AN/AN/A
Northwest Balance of State N/AN/AN/A
Southwest Balance of State N/AN/AN/A
Southeast Balance of State N/AN/AN/A
Central Minnesota 10$41.51/hr0.0%
Seven County Mpls-St Paul, MN 270$41.13/hr1.5%
Minneapolis-St Paul-Bloomington MN-WI MSA 270$41.13/hrN/A
Minnesota 300$41.13/hr1.5%


Occupations Click link for details EmploymentMedian WageProjections
% Change -
Helpers--Painters, Paperhangers, Plasterers, and Stucco Masons N/AN/AN/A
Insulation Workers, Floor, Ceiling, and Wall 1,230$25.02/hr7.3%
Glaziers 640$38.06/hr5.9%


  • Countersink nails or screws below surfaces of walls before applying sealing compounds, using hammers or screwdrivers.
  • Apply additional coats to fill in holes and make surfaces smooth.
  • Select the correct sealing compound or tape.
  • Seal joints between plasterboard or other wallboard to prepare wall surfaces for painting or papering.
  • Spread sealing compound between boards or panels or over cracks, holes, nail heads, or screw heads, using trowels, broadknives, or spatulas.
  • Spread and smooth cementing material over tape, using trowels or floating machines to blend joints with wall surfaces.
  • Mix sealing compounds by hand or with portable electric mixers.
  • Use mechanical applicators that spread compounds and embed tape in one operation.
  • Install metal molding at wall corners to secure wallboard.
  • Sand rough spots of dried cement between applications of compounds.