Occupational Employment Statistics
47-2042 Floor Layers, Except Carpet, Wood, and Hard Tiles
Apply blocks, strips, or sheets of shock-absorbing, sound-deadening, or decorative coverings to floors.
Minnesota
| 210 | 86 | $35.84/hr | $19.83/hr | $25.77/hr | $43.37/hr | $43.37/hr | $44.04/hr |
Construction | 190 | $43.37/hr |
Trade, Transportation and Utilities | N/A | N/A |
- Remove excess cement to clean finished surface.
- Measure and mark guidelines on surfaces or foundations, using chalk lines and dividers.
- Inspect surface to be covered to ensure that it is firm and dry.
- Trim excess covering materials, tack edges, and join sections of covering material to form tight joint.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Lay out, position, and apply shock-absorbing, sound-deadening, or decorative coverings to floors, walls, and cabinets, following guidelines to keep courses straight and create designs.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Determine traffic areas and decide location of seams.